LA remodel guides
Plain-English breakdowns of the LA-specific rules, codes, and financing paths that shape every remodel. Updated 2026 with SB 543, AB 130, SB 1103, and Title 24 2025 revisions.
LADBS Permit Process
How the LA Department of Building and Safety plan-check actually works in 2026: express vs standard, PermitLA same-day flows, realistic timelines per project type.
Read guide →
Title 24 Compliance Checklist for LA Remodels (2026)
California's 2025 Title 24 energy code in plain English — what triggers compliance, HERS rater testing, JA8 lighting, kitchen range-hood CFM, bathroom vent requirements.
Read guide →
HPOZ Rules for LA Homeowners (2026)
LA Historic Preservation Overlay Zones: which 37 neighborhoods are HPOZ'd, what review is required, how to get sign-off for a kitchen remodel in Hancock Park or Windsor Square.
Read guide →
LA ADU Rules 2026
The full 2026 California ADU stack in plain English: SB 543 fee elimination, AB 130 timeline mandates, AB 1033 condo sales, SB 9 lot splits, city-of-LA parking waiver, setbacks.
Read guide →
LA Wildfire Rebuild Guide
Palisades and Eaton fire rebuild in 2026: SB 1103 like-for-like expedited permits, CBC Chapter 7A WUI compliance, insurance claim supplements, burn-scar debris flow risk.
Read guide →
LA Seismic Retrofit Ordinances 183893 and 184081 (2026)
LA's two mandatory seismic retrofit laws: soft-story (Ord 183893) and non-ductile concrete (Ord 184081). Deadlines, EBB rebates, soft-story cost ranges, April 2026 compliance wave.
Read guide →
California Coastal Commission Permits for LA (2026)
When Coastal Commission review applies to LA remodels: within 1,000 ft of the coast, Malibu, Palisades, Venice, Santa Monica, Hermosa, Manhattan Beach. Timeline, cost, common denials.
Read guide →
LA Hillside Ordinance Guide (2026)
LA hillside ordinance in plain English — which lots qualify, grading limits, setback rules, driveway slope max, the geotechnical report that adds $5K–$15K.
Read guide →
LA Remodel Financing Options 2026
2026 LA remodel financing: Hearth personal loans, HELOC (home equity), FHA 203k rehab loan, cash-out refinance. Rates, pros/cons, typical use cases.
Read guide →
How to Legalize Unpermitted Work in LA (2026)
Step-by-step for legalizing unpermitted additions, garage conversions, or ADUs in LA. Code Enforcement, retro-permits, common gotchas, cost ranges.
Read guide →
How to Pick an Insurance-Approved Contractor in LA (2026)
What "insurance-approved" actually means, how insurance preferred-contractor networks work, why you're not required to use them, and how to negotiate supplemental claims.
Read guide →
LA Mansionization Rules
LA's Baseline Mansionization Ordinance (BMO) and Baseline Hillside Ordinance (BHO) in plain English — FAR limits, why your 5,000 sqft addition might not fit, R1 zoning math.
Read guide →
LA Water Damage Timeline
Water damage response in LA: first 24 hours (extraction + shoring), 1–7 days (structural drying per IICRC S500), mold activation window, insurance claim steps.
Read guide →