Skip to content
EnglishEspañol

SB 9 — Guía de división de lote en LA

Senate Bill 9 (efectivo enero 2022) permite a homeowners LA dividir un lot R1 en dos lots separados y construir hasta 4 units totales. Esta guía cubre qualifications, restrictions, timeline, costos, y cuándo SB 9 supera a un ADU regular.

Autor: Netanel Presman — CSLB RMO #1105249 · Actualizado 2026-04-18

SB 9 vs ADU — cuándo conviene cuál

ADU (Accessory Dwelling Unit). Una unit secundaria en el mismo lot. Main house + ADU sells together (salvo AB 1033). Simpler permit process, faster timeline (22–36 semanas), lower cost ($220K–$450K). Mejor si want a rental income stream or a guest house, and no quieres get into lot splits.

SB 9 urban lot split. Divide el lot en dos — each separately titled, each sellable independently. Max 4 units total (2 per lot). Más complex (14–24 meses), más expensive ($600K–$1.2M all-in), pero unlocks full land value split. Mejor si maxing out density y creating separate sellable assets es el goal.

El math matters. En Panorama City (lot value ~$280K), SB 9 split doesn't buy you much — each split lot is ~$140K, and the complexity + cost exceeds the upside. En Studio City (lot value ~$850K), SB 9 split creates two ~$425K lots — at that price tier, the investment economics work.

Los 8 pasos del SB 9 process

  1. Paso 1
    Feasibility check

    Verify lot zoning (R1), size (≥1,200 sq ft y ≥40% del original for each split), no VHFHSZ, no hillside >15%, no Coastal, no historic designation. Baily lo revisa automáticamente.

  2. Paso 2
    Hire licensed surveyor

    Surveyor produce tentative parcel map identificando el split line, setbacks, easements, y utility locations.

  3. Paso 3
    Submit SB 9 lot split application

    LADBS Planning department — administrative review. 60-day statutory clock. Fee $3,500–$7,500 typical.

  4. Paso 4
    Owner-occupancy affidavit

    State law requires 3-year owner-occupancy commitment on one of the units. Record en deed.

  5. Paso 5
    Design + permits para new construction

    Architect diseña new unit(s) en lot B. LADBS plan-check 6–14 semanas después.

  6. Paso 6
    Construction

    ADU/duplex build en lot B: 8–14 meses según size. Main house en lot A sigue as-is or gets addition.

  7. Paso 7
    Final map y separate title

    Final parcel map recorded con LA County Recorder. Each lot gets separate APN y title insurance policy.

  8. Paso 8
    Sale or rental

    Each separately-titled lot puede sellearse individualmente en fee simple. No HOA required.

Gotchas comunes que matan SB 9 deals

Loading chat…

Origin

Who is Baily?

Baily is named after Francis Baily — an English stockbroker who retired at 51, became an astronomer, and in 1836 described something on the edge of a solar eclipse that nobody had properly articulated before: a string of bright beads of sunlight breaking through the valleys along the moon’s rim.

He wasn’t the first to see them. Edmond Halley saw them in 1715 and barely noticed. Baily’s contribution was clarity — describing exactly what was happening, in plain language, so vividly that the whole field of astronomy paid attention. The phenomenon is still called Baily’s beads.

That’s what we wanted our AI to do. Every inbound call and text has signal in it — a homeowner’s real question, a timeline, a budget, a hesitation that means “yes but.” Baily listens to every one, 24/7, and finds the beads of light.

Baily was a businessman before he was a scientist. That’s our vibe too.

Questions LA homeowners actually ask