Kitchen remodel
18 Apr 2026Rp 213.975.000–855.900.000
Cabinets, counters, appliances, and plumbing/electrical updates drive the range. The top of the band reflects full layout changes and premium finishes; the bottom holds for pull-and-replace scopes on the existing footprint.
Scope yours with Baily in Jakarta→Bathroom remodel
18 Apr 2026Rp 118.875.000–404.175.000
Tile, fixtures, and waterproofing are the big drivers. Primary and ensuite bathrooms with walk-in showers or freestanding tubs sit near the top of the band; hall baths come in closer to the bottom.
Scope yours with Baily in Jakarta→ADU / accessory dwelling
18 Apr 2026Rp 855.900.000–2.139.750.000
Detached units and garage conversions vary most by square footage, foundation type, and utility runs. Where local law does not recognize ADUs, this row maps to the nearest annex / granny-flat / laneway equivalent.
Scope yours with Baily in Jakarta→Full-home renovation
18 Apr 2026Rp 1.188.750.000–4.279.500.000
Whole-home scope covers all trades plus permitting, structural, MEP, and finishes. Historic properties, listed buildings, and seismic-retrofit markets sit well above the median.
Scope yours with Baily in Jakarta→Roof replacement
18 Apr 2026Rp 57.060.000–261.525.000
Material choice (asphalt shingle, tile, standing-seam metal, membrane) dominates the range. Pitch, access, and city-specific wind/fire codes add the rest.
Scope yours with Baily in Jakarta→Rp 38.040.000–213.975.000
Composite decking, hardwood, pavers, and concrete slab are the main price bands. Elevated decks and outdoor-kitchen integrations push the high end.
Scope yours with Baily in Jakarta→Basement finishing
18 Apr 2026Rp 166.425.000–570.600.000
Framing, insulation, egress windows, and waterproofing move together. Adding a bathroom or full kitchen pushes the cost well above the base finish scope.
Scope yours with Baily in Jakarta→Pool construction
18 Apr 2026Rp 309.075.000–1.046.100.000
Gunite, vinyl-liner, and fiberglass each have distinct price bands. Spa integration, water features, and decking lift the top of the range.
Scope yours with Baily in Jakarta→Exterior paint
18 Apr 2026Rp 30.907.500–104.610.000
Prep work (siding repair, pressure wash, priming) is the hidden driver. Coastal and high-UV markets use specialty coatings that cost more but last longer.
Scope yours with Baily in Jakarta→Rp 38.040.000–190.200.000
Hardwood, LVP, tile, and stone span a wide range. Subfloor repair and leveling for old construction add meaningful cost on top of the finish material.
Scope yours with Baily in Jakarta→