ADU — Junior ADU (JADU) Cost in Miami, 2026
Why junior adu (jadu) × Miami produces this band
A junior adu (jadu) scope for a adu in Miami combines two price levers: scope and metro labor rates. JADUs carve a ≤500 SF unit out of the existing primary structure with an efficiency kitchen (no range, induction cooktop allowed) and a shared or private bath. Cheapest ADU class when the jurisdiction recognizes it. Against the national median remodel labor rate, Miami runs 10% above the national median — so the junior adu (jadu) band comes in 65% below the mid-range, then scales 10% above the national median on top of that. Permit timelines for residential work in Miami typically run 6-14 weeks, which is the window you plan your design and decision sequence against. This page gives you the actual 2026 Miami bands for this exact combination, plus the three cost drivers Baily asks about first when scoping the project live.
What drives cost for a junior adu (jadu) scope
- ·Efficiency kitchen with limited plumbing (no garbage disposal in many jurisdictions)
- ·Independent entrance cut into an exterior wall
- ·Owner-occupancy covenant recording
- ·Shared utility metering (no new service drop)
What makes Miami different
- Labor — HVHZ-certified impact-window installers and roofers are in high demand — commonly booked 10-16 weeks out.
- Labor — Post-hurricane insurance-repair cycles pull labor into cycles that compress remodel availability.
- Labor — Bilingual (English/Spanish) crew standard; reduces coordination overhead on most residential jobs.
- Material — Impact-rated glazing + hurricane shutters carry 35-60% premium over non-impact equivalents.
- Material — Coastal-grade (316 stainless steel) hardware adds 10-15% vs standard 304.
Miami rules that affect this scope
- Miami-Dade and Broward County HVHZ codes require Product Approval (NOA) for every impact window, door, and roof system — non-NOA products fail inspection.
- FEMA flood-zone requirements affect ground-floor scope in Zone AE and VE parcels — foundation and utility placement limits apply.
- Florida Building Code 2023 (FBC) wind-mitigation checklist directly affects homeowner insurance premiums post-remodel.
- Miami-Dade RER permits via iBuild — homeowner-direct for small scopes; GC-required for most kitchen/bath/addition work.
Scope your adu with Baily.
Baily asks the eight questions that determine where your project lands inside the $69K-$146K band for Miami and hands the scoped brief to one licensed builder.
Loading chat…
Related pages
Questions LA homeowners actually ask
$69,300-$146,300, with the median landing near $107,800. The range reflects finish tier and layout complexity within the junior adu (jadu) scope; the Miami labor multiplier of 1.10× vs national median is baked in.