ADU — Interior conversion Cost in Miami, 2026

Low
$99K
$99,000
Median
$154K
$154,000
High
$209K
$209,000
Scope timeline: 14-20 weeksMiami permit window: 6-14 weeksUpdated 2026-04-24

Why interior conversion × Miami produces this band

A interior conversion scope for a adu in Miami combines two price levers: scope and metro labor rates. Interior-conversion ADUs repurpose an existing enclosed space (attached garage, basement) without adding foundation or framing footprint. Faster and cheaper than a detached build. Against the national median remodel labor rate, Miami runs 10% above the national median — so the interior conversion band comes in 50% below the mid-range, then scales 10% above the national median on top of that. Permit timelines for residential work in Miami typically run 6-14 weeks, which is the window you plan your design and decision sequence against. This page gives you the actual 2026 Miami bands for this exact combination, plus the three cost drivers Baily asks about first when scoping the project live.

What drives cost for a interior conversion scope

What makes Miami different

Miami rules that affect this scope

Scope your adu with Baily.

Baily asks the eight questions that determine where your project lands inside the $99K-$209K band for Miami and hands the scoped brief to one licensed builder.