ADU — Attached ADU Cost in Miami, 2026

Low
$188K
$188,100
Median
$293K
$292,600
High
$397K
$397,100
Scope timeline: 22-32 weeksMiami permit window: 6-14 weeksUpdated 2026-04-24

Why attached adu × Miami produces this band

A attached adu scope for a adu in Miami combines two price levers: scope and metro labor rates. Attached ADUs share a wall with the primary house. Needs its own entrance, fire-rated separation, and (in most jurisdictions) independent utility metering — but shares the site's foundation-extension cost. Against the national median remodel labor rate, Miami runs 10% above the national median — so the attached adu band comes in 5% below the mid-range, then scales 10% above the national median on top of that. Permit timelines for residential work in Miami typically run 6-14 weeks, which is the window you plan your design and decision sequence against. This page gives you the actual 2026 Miami bands for this exact combination, plus the three cost drivers Baily asks about first when scoping the project live.

What drives cost for a attached adu scope

What makes Miami different

Miami rules that affect this scope

Scope your adu with Baily.

Baily asks the eight questions that determine where your project lands inside the $188K-$397K band for Miami and hands the scoped brief to one licensed builder.

Loading chat…