ADU — Attached ADU Cost in San Francisco, 2026
Why attached adu × San Francisco produces this band
A attached adu scope for a adu in San Francisco combines two price levers: scope and metro labor rates. Attached ADUs share a wall with the primary house. Needs its own entrance, fire-rated separation, and (in most jurisdictions) independent utility metering — but shares the site's foundation-extension cost. Against the national median remodel labor rate, San Francisco runs 55% above the national median — so the attached adu band comes in 5% below the mid-range, then scales 55% above the national median on top of that. Permit timelines for residential work in San Francisco typically run 10-26 weeks, which is the window you plan your design and decision sequence against. This page gives you the actual 2026 San Francisco bands for this exact combination, plus the three cost drivers Baily asks about first when scoping the project live.
What drives cost for a attached adu scope
- ·Fire-rated wall assembly (typically 1-hour, sometimes 2-hour)
- ·Independent utility service drops
- ·Shared-wall sound isolation (STC 50+)
- ·Grading and drainage on the new footprint
What makes San Francisco different
- Labor — Bay Area CSLB-licensed contractor scarcity keeps labor rates the highest in California.
- Labor — Union framing and electrical rates carry a 30-35% premium over national median.
- Labor — Tech-sector remodel demand (Noe Valley, Pacific Heights, Sea Cliff) competes for premium-finish crews.
- Material — Victorian + Edwardian heritage restoration uses specialty millwork and painters — significant premium.
- Material — Title 24 energy code same as rest of CA — envelope + glazing premium.
San Francisco rules that affect this scope
- SF DBI permit process is notably long (10-26 weeks typical; discretionary review on most kitchen/bath >$25K).
- Section 317 (Residential Demolition) controls ADU and addition work — lot merger and demolition ratio tracked.
- Historic Preservation Commission review for Articles 10 + 11 properties adds 8-16 weeks.
- Soft-story retrofit ordinance (SF Ordinance 66-13) affects multi-family properties with tuck-under parking.
Scope your adu with Baily.
Baily asks the eight questions that determine where your project lands inside the $265K-$560K band for San Francisco and hands the scoped brief to one licensed builder.