ADU — Attached ADU Cost in San Diego, 2026

Low
$231K
$230,850
Median
$359K
$359,100
High
$487K
$487,350
Scope timeline: 22-32 weeksSan Diego permit window: 6-14 weeksUpdated 2026-04-24

Why attached adu × San Diego produces this band

A attached adu scope for a adu in San Diego combines two price levers: scope and metro labor rates. Attached ADUs share a wall with the primary house. Needs its own entrance, fire-rated separation, and (in most jurisdictions) independent utility metering — but shares the site's foundation-extension cost. Against the national median remodel labor rate, San Diego runs 35% above the national median — so the attached adu band comes in 5% below the mid-range, then scales 35% above the national median on top of that. Permit timelines for residential work in San Diego typically run 6-14 weeks, which is the window you plan your design and decision sequence against. This page gives you the actual 2026 San Diego bands for this exact combination, plus the three cost drivers Baily asks about first when scoping the project live.

What drives cost for a attached adu scope

What makes San Diego different

San Diego rules that affect this scope

Scope your adu with Baily.

Baily asks the eight questions that determine where your project lands inside the $231K-$487K band for San Diego and hands the scoped brief to one licensed builder.